| Access for fire brigade vehicles and firefighters (PDF , 2.8 MB) | Fire Safety Guideline | 2020-11-17 | Fire Safety |
| Accessibility of fire hydrants (PDF , 220.8 KB) | Position Statement Summary | 2024-04-29 | Fire Safety |
| Applicable Building Code of Australia (BCA) (PDF , 240.5 KB) | Position Statement Summary | 2024-04-29 | Fire Safety |
| Application of fire sprinkler concessions under Specification 18 of the NCC (PDF , 182.8 KB) | Position Statement Summary | 2024-08-30 | Fire Safety |
| Automated vehicle parking system (PDF , 188.4 KB) | Position Statement Summary | 2024-04-29 | Fire Safety |
| Automatic storage and retrieval systems (ASRS) (PDF , 138.3 KB) | Position Statement Summary | 2024-12-05 | Fire Safety |
| CFD zone modelling inputs (MS Word Document, 653.5 KB) | Forms | 2024-11-01 | Fire Safety,Fire Safety Infrastructure Unit,Fire Safety Liaison Unit |
| Comment on an occupied building (MS Word Document, 596.9 KB) | Forms | 2026-01-30 | Fire Safety Compliance Unit |
| Consultation on the performance-based design brief (PBDB) (PDF , 218.0 KB) | Position Statement Summary | 2024-08-30 | Fire Safety |
| Consultation with the relevant fire brigade, fire service or fire authority (PDF , 216.3 KB) | Position Statement Summary | 2024-04-29 | Fire Safety |
| Dry fire hydrant system (PDF , 217.6 KB) | Position Statement Summary | 2024-06-04 | Fire Safety |
| ESIP template (MS Word Document, 32.2 KB) | Template | 2023-03-20 | Fire Safety Liaison Unit |
| Electric vehicles (EV) and EV charging equipment (PDF , 224.0 KB) | Position Statement Summary | 2024-06-04 | Fire Safety |
| Emergency plan requirements at sites having lithium batteries (PDF , 252.8 KB) | Position Statement Summary | 2024-12-05 | Fire Safety |
| Emergency services information package and tactical fire plans (PDF , 815.4 KB) | Fire Safety Guideline | 2023-03-20 | Fire Safety Liaison Unit |
| Exemption from fire safety standards (PDF , 238.2 KB) | Position Statement Summary | 2024-04-29 | Fire Safety |
| Extended fire hydrant coverage (PDF , 182.4 KB) | Position Statement Summary | 2024-06-14 | Fire Safety |
| External combustible cladding (PDF , 178.1 KB) | Position Statement Summary | 2024-06-14 | Fire Safety |
| FRNSW compatible Storz hose connections (PDF , 286.1 KB) | Technical Information Sheet | 2026-01-13 | Fire Safety |
| FRNSW hose connections (PDF , 172.0 KB) | Position Statement Summary | 2026-01-13 | Fire Safety |
| FRNSW meeting application (MS Word Document, 602.1 KB) | Forms | 2026-01-30 | Fire Safety |
| FRNSW pump performance for high rise buildings (PDF , 215.5 KB) | Position Statement Summary | 2024-12-05 | Fire Safety |
| FRNSW written report application (MS Word Document, 607.1 KB) | Forms | 2026-01-30 | Fire Safety |
| Final fire safety report (FFSR) application (MS Word Document, 606.1 KB) | Forms | 2026-01-30 | Fire Safety Pre-Occupancy Unit,Fire Safety Infrastructure Unit |
| Final fire safety report process (PDF , 1.1 MB) | Technical Information Sheet | 2020-01-15 | Fire Safety Pre-Occupancy Unit |
| Fire Safety Position Paper - Electric vehicles (EV) and EV charging equipment in the built environment v1.0 (PDF , 4.4 MB) | Research | 2025-03-15 | Fire Safety |
| Fire brigade booster operating pressure (PDF , 181.9 KB) | Position Statement Summary | 2024-12-05 | Fire Safety |
| Fire brigade boosters with inlet inserts (PDF , 394.8 KB) | Technical Information Sheet | 2019-03-12 | Fire Safety |
| Fire doors with fire activated retaining devices (e.g. bolts) (PDF , 214.8 KB) | Position Statement Summary | 2024-12-23 | Fire Safety |
| Fire engineering for existing buildings (PDF , 215.0 KB) | Position Statement Summary | 2024-09-12 | Fire Safety |
| Fire hydrant concessions for existing buildings (PDF , 1.3 MB) | Technical Information Sheet | 2020-02-27 | Fire Safety |
| Fire hydrant system - single vs multiple (PDF , 138.3 KB) | Position Statement Summary | 2024-10-09 | Fire Safety |
| Fire hydrant system in existing building or premises (PDF , 211.8 KB) | Position Statement Summary | 2024-09-12 | Fire Safety |
| Fire hydrant system in new building or premises (PDF , 184.6 KB) | Position Statement Summary | 2024-08-30 | Fire Safety |
| Fire hydrant system signage (PDF , 602.3 KB) | Position Statement Summary | 2024-12-05 | Fire Safety |
| Fire hydrants for minor residential development (PDF , 3.2 MB) | Fire Safety Guideline | 2016-09-01 | Fire Safety |
| Fire safety exemption application (MS Word Document, 621.6 KB) | Forms | 2026-01-30 | Fire Safety Pre-Occupancy Unit |
| Fire safety in early childhood centres (PDF , 236.4 KB) | Position Statement Summary | 2024-09-12 | Fire Safety |
| Fire safety in waste facilities (PDF , 826.3 KB) | Fire Safety Guideline | 2020-02-27 | Fire Safety Liaison Unit |
| Fire safety study process (PDF , 219.3 KB) | Position Statement Summary | 2024-06-14 | Fire Safety |
| Fire safety system report (FSSR) application (MS Word Document, 605.5 KB) | Forms | 2026-01-30 | Fire Safety Pre-Occupancy Unit |
| Fire safety system report process (PDF , 809.1 KB) | Technical Information Sheet | 2020-01-15 | Fire Safety Pre-Occupancy Unit |
| Fire sprinkler system in existing building or premises (PDF , 214.1 KB) | Position Statement Summary | 2024-09-12 | Fire Safety |
| Fire sprinklers in class 1 buildings (i.e. homes) (PDF , 177.7 KB) | Position Statement Summary | 2024-08-30 | Fire Safety |
| Fire sprinklers in class 2 and 3 buildings (PDF , 220.1 KB) | Position Statement Summary | 2024-09-30 | Fire Safety |
| Fixed suction connection for below-ground water supply (PDF , 212.9 KB) | Position Statement Summary | 2024-08-30 | Fire Safety |
| General fire safety assessment or inspection (MS Word Document, 605.5 KB) | Forms | 2026-01-30 | Fire Safety Infrastructure Unit,Fire Safety Pre-Occupancy Unit |
| Guideline for bulk storage of rubber tyres (PDF , 814.9 KB) | Fire Safety Guideline | 2014-12-05 | Fire Safety Liaison Unit |
| Guideline for impulse fans in car parks (PDF , 548.5 KB) | Fire Safety Guideline | 2014-10-09 | Fire Safety Advisory Unit |
| Hazardous chemicals manifest (PDF , 206.6 KB) | Technical Information Sheet | 2023-03-20 | Fire Safety Liaison Unit |
| Hydraulic fire safety system design (PDF , 217.1 KB) | Position Statement Summary | 2024-12-05 | Fire Safety |
| Initial fire safety report (IFSR) application (MS Word Document, 647.5 KB) | Forms | 2026-01-30 | Fire Safety Advisory Unit,Fire Safety Infrastructure Unit,Fire Safety Liaison Unit |
| Initial fire safety report process (PDF , 812.8 KB) | Technical Information Sheet | 2020-01-15 | Fire Safety Advisory Unit |
| Large-scale external LiBESS - Fire safety study considerations (PDF , 189.0 KB) | Technical Information Sheet | 2023-07-26 | Fire Safety Liaison Unit |
| Light wall steel pipe in fire hydrant systems (PDF , 193.9 KB) | Position Statement Summary | 2024-12-05 | Fire Safety |
| Massive timber building systems (PDF , 180.2 KB) | | 2025-01-01 | |
| Notification and assessment of radiation gauge (MS Word Document, 595.8 KB) | Forms | 2026-01-30 | Fire Safety Liaison Unit |
| Open yard storage of battery energy storage systems (BESS) (PDF , 276.2 KB) | Position Statement Summary | 2024-12-05 | Fire Safety |
| Performance-based design brief (PBDB) consultation (MS Word Document, 683.5 KB) | Forms | 2026-01-30 | Fire Safety Advisory Unit,Fire Safety Infrastructure Unit,Fire Safety Liaison Unit |
| Pilot operated pressure reduction valve (PO-PRV) installation (PDF , 382.7 KB) | Position Statement Summary | 2024-12-05 | Fire Safety |
| Plastic pipe in combined fire hydrant and sprinkler systems (PDF , 175.2 KB) | Position Statement Summary | 2024-12-05 | Fire Safety |
| Pressure reducing fire hydrant valve (PRFHV) (PDF , 177.7 KB) | Position Statement Summary | 2024-08-30 | Fire Safety |
| Public consultation submission template (MS Word Document, 532.3 KB) | Template | 2026-01-30 | Fire Safety Policy Unit |
| Request for joint inspection (MS Word Document, 592.7 KB) | Forms | 2026-01-30 | Fire Safety Compliance Unit |
| Request to prepare emergency plans report (MS Word Document, 602.0 KB) | | 2026-01-30 | |
| Road tunnels (PDF , 184.0 KB) | Position Statement Summary | 2024-12-05 | Fire Safety Infrastructure Unit |
| Security/screen doors fitted to sole-occupancy units (SOUs) (PDF , 174.6 KB) | Position Statement Summary | 2024-08-30 | Fire Safety |
| Self-storage facilities (PDF , 149.1 KB) | Position Statement Summary | 2024-10-09 | Fire Safety |
| Small-bore suction connections (PDF , 212.7 KB) | Position Statement Summary | 2024-06-20 | Fire Safety |